Default Example of post earth quake leveling

Pictures below show how I'm leveling the welded RSJ grid structure but demonstrates the jack it up and kick ballast under railway sleepers post earth quake irritations (!)



Here I'm using ratchet straps to raise the sleepers into position under the RSJs.

M12 wood bolts used to fix sleeper to RSJ





A technical triumph => booting the ballast into place under the sleeper (steel toe caps recommended)



The next stage is to weld the upper structure onto the RSJ grid base. I hope this doesn't cause the newly leveled parts to settle too far but after I've loaded the structure with about 5 tons of OSB sheet material I'm guessing some levleing adjustments might be necessary (!)
Attached Images
File Type: jpg Workshop ready for welding4.jpg (396.9 KB, 76 views)
File Type: jpg Workshop ready for welding5.jpg (256.1 KB, 75 views)
File Type: jpg Workshop ready for welding6.jpg (207.8 KB, 79 views)
File Type: jpg Workshop ready fpr welding7.jpg (263.2 KB, 76 views)
__________________
1961 Volvo PV544 the quick and easy in between project(!)
1981 Mercedes 300D <=> 230 diesel to petrol conversion project
1965 Series 2a Station Wagon mega build
1992 Mercedes 190E The car that works!
Army is offline   Reply With Quote