View Single Post
Old Apr 10th, 2013, 12:04   #14
Funky Diver
FD
 
Funky Diver's Avatar
 

Last Online: Aug 23rd, 2023 22:44
Join Date: Jan 2013
Location: Darlington
Default

I think I had the same type of LED strips as you Ian.

These were the ones I got, I cut 9 off to get a good size to fit the whole cluster

I did it slightly differently though.

Drilled 3 pairs of holes in the back plate of the cluster.
Drilled an extra hole in the top to pass a draw cord down.
Drill six holes in the bottom to pass the LED strips up though.

The top showing draw string hole...


The bottom end showing the access hole.


I passed a draw cord down to the access hole, fixed on the LED strip and pulled it up, attaching the LEDs to the back plate using cable ties through the holes.

Sealed the holes with silicon, job done. Mebbe took 20 minutes for both sides.

Last edited by Funky Diver; Apr 10th, 2013 at 12:07.
Funky Diver is offline   Reply With Quote
The Following 2 Users Say Thank You to Funky Diver For This Useful Post: