View Single Post
Old Feb 22nd, 2021, 11:57   #28
Juular
Senior Member
 

Last Online: Today 10:01
Join Date: Sep 2020
Location: Falkirk
Default

More bits repaired.

Inner and outer sill finished at the front.



It may look a bit tatty or ragged but everything will be ground flush and tidy.

Important drain hole kept in place.





Passenger floor finished off.





Which allows me to fit the home made outrigger.



Plug welded from above.



Fits millimetre perfect, very happy.





Coat of zinc. It will all get cavity wax and a final coat of something durable.



The passenger floor is now finished and totally sound. Just needs paint and soundproofing etc.



Next job.. dealing with the rot at the outer sill/ step area and joining it all up with the A pillar.
Juular is offline   Reply With Quote
The Following 5 Users Say Thank You to Juular For This Useful Post: