Quote:
Originally Posted by cadaron
Thank you for the reply.
Having re-modelled with 3 columns, and allowing 5 m between rows we know have a convoy 3.15 km long (1.9 miles), and made up of 333 rows, which means we have less than 1 km between the front row and the last row, assuming every row sets of one at a time as opposed to all at once, is there a danger that the front rows will have to stop behind the last row as they have run out of track before the last row can set off?
Just interested to have your thoughts as we watch this challenge grow to what appears significant numbers.
|
I guess we'll find out on the day